Data Center

Site No. 1 (Chiyoda Ward, Tokyo)

Main Features

Feature
  • 1

    Internet Hub

    Strategically located in the area of a high concentration of IXs (Internet Exchanges), high-speed communication and large data transfer is available.
  • 2

    Business and Finance Hub

    Perfect for collaborating with various types of organizations and businesses.
  • 3

    3 Minutes from Otemachi Station

    Quick access for your on-site work.

Overview

Outline

Rack Power

Actual power per rack 2kVA*
・Standard power supply: AC 100V 20A × 2 diverse lines per rack
・Additional power supply: AC 100V 20A, AC 200V 30A

* Standard power

Power Supply

Highly reliable power facilities
・Extra high-voltage 22 kV three-unit spot network
・Standby generators in a N+1 redundant configuration, running up to 21 hours without refueling.
・UPS in a N+1 redundant configuration, running up to 20 minutes

Disaster Resistance

Low-Risk location for natural disasters
The Otemachi district has been designated by the Tokyo Metropolitan Government as an area with the lowest risk of building collapse and fires during an earthquake and does not require large-scale evacuations. The electricity, gas, and heat infrastructure were built with an emphasis on safety, making them strong against disasters and making quick recovery possible.

Security Management

24-hour staffed entrance system
Two-step verification: Visitors to the data center are screened face-to-face by reception staff and must pass a biometric authentication system at entrance gates.
By combining a biometric access control system and a 24-hour staffed entrance, our facility achieves a high level of security.
Image for illustration purposes only.

Video service
Video Remote Hands / Video Concierge

By utilizing video conference tools, we can operate equipment inside racks, storage, and cages on behalf of customers.

Features

Customers (remote location) can cross-check the work status with our engineers (on-site) through real-time video conferences.
Prior preparation of procedure manual is not required.(Depending on the service, we may ask for a procedure manual or prior arrangements)
Service Location: New Otemachi site, Site No. 1 (Please contact us for details)

Facility

Facility
Power-Receiving System Extra high-voltage 22 kV three-unit spot network
Emergency Power UPS: N+2 redundant configuration
Seismic Resistance Earthquake-resistant construction
Air-Flow System Underfloor Air-Flow System
Fire Extinguishing System Gas fire extinguishers
Raised Flooring Height 500 mm
Floor Load Capacity 600 kg/m2
Room Temperature 24 ℃ ± 2 ℃
Security 24-hour staffed entrance
Access control system
(RFID card + wireless badge)
Security cameras

Monitoring System

Monitoring

24/7/365 Service Desk

  • Round-the-clock monitoring staff
  • Security system monitoring
  • Security surveillance cameras
    (24-hour recording)
  • Continuous electric current monitoring
  • English operation support

Contact

Contact
Please feel free to contact us if you have any questions or requests regarding our services.
Telephone inquiry
Reception hours 9:30 - 17:00 JST (weekdays only, excluding holidays)
Page Top